Designing and implementing a Mitsubishi PLC-based SCADA system needs a meticulous approach. Primary considerations include the size of the project, the nature of data to be tracked, and the desired level of control. A well-defined system architecture is vital for ensuring efficient data gathering from the field. This involves selecting appropriate